Gold Line Bridge over 210 Shows Design Elements, Beacon Media Gets a Peek at the Progress
Gold Line’s Massive Bridge over 210 Shows Design Elements
Beacon Media Gets a behind the scenes Peek at the Progress Friday Morning
Motorists traveling eastbound on the 210 will notice some of the architectural features of the $20 Million Gold Line Bridge in Arcadia starting to come to light. The on time and on budget project is slated for a dedication in December. Despite the 113 degree heat in the work zone area, Metro workers have managed to have zero accidents in all the workdays it has taken to get to this point.
The other architectural elements, ie the native baskets will be assembled on site and will be visible soon. Look for a detailed story in next week’s newspapers.
Photos by Terry Miller